Individual installations typically take 1-2 days per location, with minimal disruption to surrounding areas
Installation is planned to be completed by mid-2026.
Anyone with a compatible electric vehicle. Users pay the CPO directly for charging sessions
These spaces will be designated for EVs, and the number of spaces will reflect the mix of non-EV and EV vehicles.
All chargers are rated up to 22 kW AC. However, depending on the type of EV you have, you may only be able to receive 7 or 11 kW.
Single and dual bay chargers will be proposed.
Please refer to the links under 'Location Details' for information on whether each location requires a single or dual bay charger.
A single bay charger has a single port, meaning it can accommodate only one charging vehicle. There will be one parking bay marked ‘EV only while charging’.
A dual bay charger has two ports and can accommodate two charging vehicles simultaneously. Two bays will be marked ‘EV only while charging’.
Please refer to the links under 'Location Details' for information on whether each location requires a single or dual bay charger.
Yes, all chargers will be powered by 100% renewable electricity.
The charge point operators, Plus ES and ChargePost, will be responsible for the maintenance of these chargers.
All pricing will be set by the charge point operators.
These chargers are fully funded by the NSW Government and charge point operators – there is no cost to Council to install the chargers.
All proposed locations are in free parking areas. Fees for charging may apply and are set by the charge point operator.
Electric Vehicles must be charging while parking. Fines may be issued for those who do not comply.
All proposals are 'EV only while charging'. Time restrictions may apply. Please refer to the links under ‘Location details’ for location specific information.
The total number of parking spaces will remain the same,. The proposals will be marked 'EV only while charging' and some may have time restrictions.
P: 02 9424 0000
E: ejiang@krg.nsw.gov.au
XX October 2025 – XX November 2025
All submissions will be considered
Locations to proceed to final assessments and approvals are endorsed
Approved locations will be updated on our Electric Vehicle Public Chargers page.
EV Chargers are scheduled to be installed by mid-2026
The following locations are being considered for new EV chargers in the suburbs of Gordon and Killara.
Each address link below provides aerial and street view images, along with technical site details.
The address listed represents the closest point to the proposed EV charger installation.
Why your participation matters
Your input will directly inform the final selection of locations after the consultation period ends and Council completes its evaluation.