Project details
Concept Plan
View the concept plan below (click for a larger version or download here)
Planned works
- New kerb, gutter and road surface
- Upgraded stormwater drainage systems
- Improved cul-de-sac drainage with environmental compliance
- Replacement of approved vehicle crossings with new standard concrete driveways
- New signage and road markings
- Replacement tree planting
Driveway Upgrades
Residents with gravel crossings can upgrade to concrete at their cost during construction.
Tree management
Council prioritises preserving high-value street trees where possible. Some removal may be required due to major root encroachment or poor tree condition.
Trees that may be removed due to major root encroachment:
- Adjacent to 125 Springdale Road – Liquidambar (Liquidambar styraciflua)
- Outside 8 Monash Avenue - Camellia (Camellia sasanqua)
- Outside 10 Monash Avenue - Norfolk Island Pine (Araucaria heterophylla)
- Outside 12 Monash Avenue - Crab Apple (Malus x floribunda)
- Outside 12 Monash Ave - Broad-leaved Scribbly Gum (Eucalyptus haemastoma)
- Road verge south of 5 Monash Ave - Red Bloodwood (Corymbia gummifera)
- Outside 5 Monash Ave - Jacaranda (Jacaranda mimosifolia)
- Outside 5 Monash Ave - Sour Gum (Nyssa sylvatica)
Trees that may be removed due to poor condition:
- Outside 8 Monash Ave - Forest Oak (Allocasuarina torulosa)
Replacement trees will be planted to maintain our urban canopy.
Timeline
We aim to finalise the project design by mid-2026. Construction will then commence subject to environmental approvals, budget availability and Council’s mandatory procurement process.
Have your say
Please provide feedback via the written submission function on this page or write to us as follows quoting Ref: 2025/257443
Email: krg@krg.nsw.gov.au
Mail: General Manager, Ku-ring-gai Council, Locked Bag 1006 Gordon NSW 2072
Comments close Friday 13 February 2026.